
Rear additions
A bigger kitchen, family room or main-floor bedroom off the back of the house.
Rear additions, second storeys and rooms over the garage, with the drawings and the Town of Grimsby permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately. See the full cost guide.

Going up keeps your yard and can double the bedrooms on the same lot. Before anything is drawn, an engineer checks that the foundation and walls can carry the new floor.
Second storeys fall in the same rough budget as other additions, $300 to $500 per sq ft before HST.
Read the second-storey guideYes. Additions need a building permit from the Town of Grimsby, applied for through Cloudpermit or at the Town Hall kiosk. Read the full permit guide.
Any addition, a second storey, a room over the garage or a bump-out.
Site and grading plan, foundation, floor and roof plans, elevations, a cross section and the heating design.
An initial review in 10 business days if complete. The Town's average for residential alterations is about 7 weeks.
Lots in the Niagara Escarpment Commission's area need its development permit.
Lots in the Niagara Peninsula Conservation Authority's regulated area need its permit too.
Most applications come in between May and September, so plan the permit for the off-season.
Rear, side and second-storey additions in Grimsby and the towns next to it.
Downtown and the neighbourhoods below the Escarpment.
Older cottages and homes along Lake Ontario.
East along the QEW in the Town of Lincoln.
West along the QEW in Hamilton.
Yes. The Town of Grimsby needs a building permit for additions. Apply through Cloudpermit or at the kiosk in Town Hall.
As a rough budget, $300 to $500 per sq ft before HST. Design and permits are priced separately and quoted after the site visit.
Plan on 2 to 6 months for design and permits, then 5 to 9 months to build, depending on the size, inspections and any changes along the way.
If the application is complete, the Town does its first review in 10 business days. Its average for residential alterations is about 7 weeks, and each resubmission can add 2 weeks or more.
Often, yes, if the foundation and walls can carry it and the zoning allows the height. An engineer checks the structure before anything is drawn.
Only if the addition doesn't meet the zoning by-law, for example on setbacks, height or lot coverage. That goes to the Committee of Adjustment before the building permit.
Only if the lot is in the Niagara Escarpment Commission's regulated area. If it is, that permit comes before the building permit.
A site visit shows what your lot allows and what an addition would involve.